Overall construction view. Roads N2 and D7 are under construction.
Artist's Impression
Zone 1 & 2 from the above.
Artist's Impression
Zone 1 & 2 from the above.
Artist's Impression
Zone 1: Units C.01 and C.02 are under painting and installation works for doors, windows, and balconies. Units C.03 to C.08 are under RC structure works at Levels 1 to 3.
Artist's Impression
Zone 2: Units C.42 and C.43 are under construction for roof and attic floors. Units C.35 to C.40 are under RC structure works on the ground floor and Level 1.
Artist's Impression
Zone 3: Units C.22 to C.28 are under RC structure works on the ground floor and Level 1.
Artist's Impression
Zone 4: Units C.13 to C.21 are under RC structure works at Levels 1 to 3.
Artist's Impression
Overall construction view. Roads N2 and D7 are under construction.
Zone 1 & 2 from the above.
Zone 1 & 2 from the above.
Zone 1: Units C.01 and C.02 are under painting and installation works for doors, windows, and balconies. Units C.03 to C.08 are under RC structure works at Levels 1 to 3.
Zone 2: Units C.42 and C.43 are under construction for roof and attic floors. Units C.35 to C.40 are under RC structure works on the ground floor and Level 1.
Zone 3: Units C.22 to C.28 are under RC structure works on the ground floor and Level 1.
Zone 4: Units C.13 to C.21 are under RC structure works at Levels 1 to 3.